About Us

High-efficiency low-carbon hot-blast stove green intelligent Annec

The new 1# blast furnace of Sanbao Group, which was contracted by Anneke, was successfully ignited.

Time:

2020-09-12

Source:

Author:

On September 11, 2020, Fujian Sanbao Group's new No. 1 blast furnace project was completed and ignited!

The project is a 1700m3 blast furnace with three top-burning hot blast stoves. The design, manufacture, supply and after-sales service of refractory materials for the hot blast stove system are integrated and contracted by Anneke Company.

The new 1# blast furnace is the landing of Sanbao Group in response to the national iron and steel industry structure adjustment, upgrading, energy conservation, environmental protection and ultra-low emission call. The design of the hot blast furnace adheres to the concept of ecology and greening, and adopts a swirl burner, which can realize low nitrogen combustion. The emission index design of NOX and other pollutants is <70mg/m3, which is far lower than the "Ultra-low emission Standard for Air Pollutants in the iron and steel industry.

Anneke will continue to uphold the company's mission of "continuously promoting the technological development of blast furnace hot blast stove and the progress of refractory technology", continue to devote itself to the optimization and improvement of top-burning hot blast stove technology and the research and development and production of supporting refractory materials, and continuously optimize and upgrade the furnace structure and refractory configuration to provide top-burning hot blast stove technology with high temperature, long life, energy saving and consumption reduction, and intensive capital reduction for users of iron and steel enterprises in China.

New 1# Blast Furnace Ignition Site

New 1# Blast Furnace Hot Blast Stove